XIDIAN ENERGY CONSTRUCTION CORP

Energy Connected, Future Empowered

who we are

Xidian(XD) Group boasts an extensive track record over two decades in the industry. Drawing inspiration from the renowned "West Point Military Academy", unwavering commitment to execution excellence and service awareness which serve as the bedrock of its com petitive edge.

Xidian Energy Construction Corp.(XDEC) was established in 2017. After continuous development for more than 6 years, it has now become an engineering construction company characterized by diversified operations,industrial integration, and group development.

  • what we do


    XDEC is engaged construction, assembly, testing, commissioning, rehabilitation of power plants and other power generation systems, substations and related facilities and equipment; and to design, develop, assemble, construct and operate other power related facilities, appliances and devices, se- curing any needed licenses or permits to engage in such business activities, and purchasing or otherwise acquiring.


Core Advantages of XDEC
  • PCAB AAA Qualification

  • Faster turn over and better quality

  • No outsourcing in the whole process and higher cost performance

  • Authoritative and international construc- tion consultant team








XDEC Standards

XDEC has the PCAB AAA license issued by the Philippines. lt creates visible "XDEC Standards" with financial strength, service quality, management level, and business ability, and is committed to building high-quality and excellent engineering projects for the owners according to the "XDEC Standards"

XDEC Support

XDEC possesses an extensive array of machinery tools and equipment, numbering in the hundreds that are essential for executing all types of HEP projects, constructing transmission facilities and substation facilities, as well as undertaking PV projects. This comprehensive inventory guarantees the in-house capabilities of XDEC in carrying out a wide range of construction endeavors.

XDEC Wisdom

XDEC has a team of young, efficient, and experienced professional technicians and a team of construction consultants from domestic authorities and even China's senior consultant firms to ensure quality and safety throughout the whole project construction cycle with cutting-edge technology, considerate services, and good communication. Over the past six years, XDEC has continuously created jobs and carried out on-the-job training to pass down the XDEC wisdom.

  •  
  •  








XDEC Experience

I.ELPI 100 MW Photovoltaic Project

The ELPI Photovoltaic Project is located in Pasuquin and Burgos, Ilocos Norte, Philippines. lt is the first large-scale project in the energy field for the bilateral economic and trade cooperation between China and the Philippines after former President Rodrigo Duterte's first visit to China, as well as one of the largest new energy projects in Southeast Asia. The Project can be divided into three parts, i.e. PV site area, step-up substation and opposite bay, and transmission lines.

The Project encompasses a substantial scale of 100 MW (DC side), featuring an impressive installation of 8176 groups of 340W PV panels. Additionally, it involves the construction of a new 115 kV substation, with two 50 MVA main transformers installed in the substation. The electric transmission line spans an extensive distance of 30.4 km, supported by the meticulously planned infrastructure consisting of 94 bases of transmission towers, 41 bases of suspension towers and 52 bases of tensioning towers. The right of way of the Project is complicated. XDEC assumes full responsibility for the general contracting of all three parts, as well as overseeing all coordination efforts associated with the Project, At present, the Project has been successfully completed.

XDEC Experience
II.6 MW IBULAO Hydro Electric Power Plant Project

The 6MW IBULAO HYDRO ELECTRIC POWER PLANT proiect is located within the boundary of line of two Municipalities, the Municipality of Lagawe and Municipality of Kiangan in lfugao.

The municipality of Lagawe is located at the heart of Ifugao province and is said to be the provincial capital. It is bounded in the east by the municipality of Diadi Nueva Viscaya; on the west by the municipality of Kiangan; on the north by the municipalities of Hingyon and Banawe and on the south by the municipality of Asipulo.The municipality of Kiangan is locate at the southwest direction of Lagawe also known as the Provincial Capital of Ifugao for about ten kilometers away.It is bounded on the east by the municipalities of Lagawe and Lamut; on the west by the municipality of Tinoc; on the north by the municipality of Hingyon and on the south by the municipality of Asipulo.The development of the project is contributing factors to the stability of the power supply in the Luzon grid and most particularly to the host municipalities, Lagawe and Kiangan. This project comprises the following components; Weir, Intake Structure, Penstock Powerhouse with ElectroMechanical Equipment, Tailrace, Switchyard and Transmission Line



Mission&Vision

XDEC is committed to serving the owners, keeping up with the tide of industrialization and globalization in the Philippines, firmly seizing the golden development period brought about by the Next Six-Year lnfrastructure Plan, integrating resources from all parties, carrying out international and domestic cooperation, and contributing to the economic acceleration and sustainable development of the Philippines.